LW Addendum No. 1 by Luke George | 5/3/2010 1:00 PM |
LW Addendum No. 1 is now posted to the website. It is a 6 part Addenda. Make sure you download all parts.
Bid Due Date remains as Friday, May 21, 2010, by 2pm.
|
| |
Bid Documents by Denise Albernaz | 4/29/2010 1:52 PM |
|
|
| |
LINCOLN WAY 100% DRAWINGS by Luke George | 4/26/2010 3:50 PM |
The 100% CD's are posted. The new due date is May 21, 2010, by 2pm.
Scopes are as sent out previously, and will be revised by Notices, if required.
|
| |
Due Date Postponed by Luke George | 4/14/2010 10:44 AM |
A Bid Notice was sent out on 4-9-10 stating that the revised due dates are as follows:
Jackson Gardens (JG): Due 4-21-10 @ 2PM
Lincoln Way (LW): Due 4-23-10 @ 2PM
|
| |
Jackson Gardens Addendum 1 by Luke George | 4/5/2010 10:03 AM |
Addendum 1 has been posted for our Non-Filed Sub Trades. If you have responded to the bid invite, you will get hard copies mailed to you.
|
| |