BID DATE/RFI CUTOFF/SUBSTITUTION REQUEST POSTPONED  by Daniel O'Connell | 7/2/2009 8:24 AM |
Bid due date has been postponed to July 27th and July 28th. Please see attached bid due date schedule for respective trades and times.
RFI deadline has been postponed to July 10th, 2009. Please submit all RFI's electronically to doconnell@dimeo.com...
|
| |
EQUALS AND SUBSTITUTION REQUESTS PROCEDURES  by Daniel O'Connell | 6/22/2009 1:38 PM |
In reference to Section 01025 – Substitution Procedures, each bidder may propose a material and/or equipment substitution to be evaluated by the Construction Manager, Architect/Engineer, Owner and Construction Administrator prior to the submission...
|
| |
Available bid packages  by Daniel O'Connell | 6/18/2009 1:24 PM |
Attached are the available bid packages for the project.
|
| |
Schedule of Pre-Bid Conferences  by Daniel O'Connell | 6/18/2009 12:54 PM |
Attached please find the schedule for the pre-bid conferences. Also reference the list of available bid packages for description of each bid package. Due to the size and complexity of the project, it is STRONGLY RECOMMENDED that all bidders attend...
|
| |
Bid Due Dates/Times/Locations  by Daniel O'Connell | 6/18/2009 12:52 PM |
Attached please find schedule of Bid Due dates and times. Also reference list of available bid packages for descriptions of available bid packages. Bids will be received Room #207 at Gateway Community College, North Haven Campus, 88 Bassett Road,...
|
| |
Drawings and Specification are now available by Daniel O'Connell | 6/18/2009 11:35 AM |
Drawings and specifications are currently posted to this website. These documents are also available at Joseph Merritt in New Haven. Contact Joseph Merritt at 203-562-9885 or to access Joseph Merritt’s Planwell Site: Go to www.merrittgraphics.com,
|
| |
Addendum #2 is forthcoming by Daniel O'Connell | 6/18/2009 11:24 AM |
Addendum #1 is incorporated in the drawings and specifications posted on this website. Addendum #2 will be issued on Wednesday, June 24, 2009 and will be available on this website and thru Joseph Merritt in New Haven. Addendum #2 will consist of the...
|
| |
RFI Deadline and Procedure by Daniel O'Connell | 6/18/2009 11:15 AM |
All technical and bid questions must be in writing (not phoned) and faxed or emailed to Dimeo Construction Company, attn: Dan O’Connell at 401-461-4580 or doconnell@dimeo.com. Deadline for RFI's is July 3, 2009.
|
| |
How to Download Bid Documents by Donald McCourt | 4/15/2009 4:00 PM |
|
|
| |
Adobe Acrobat & AutoCad (Autodesk) DWF Viewer by Donald McCourt | 4/13/2009 11:02 AM |
Adobe Acrobat and AutoCad (Autodesk) DWF viewers are available for free downloading. Links to both sites are in the lower left corner of the home page.
|
| |
On Screen Take-Off Viewer Posted! by Donald McCourt | 4/13/2009 11:02 AM |
We've added a link to download a FREE plan viewer from On-Center Software. This viewer is a fast, free method of viewing multiple TIFF, PDF, CAD files. It also includes a tool for simple measurements. Full version is available for purchase from the...
|
| |